admin@mazurekgravity.in

Consider the liquid blending control system shown in Figure 1 where streaml consists of a mixture of two components and stream 2 has x2= 1. An overflow line maintains a constant holdup in the tank. The control objective is to control the blend composition, x, which can be measured online but there is a significant transport time delay associated with the location of the composition measurement, which is downstream of the blending tank. Inlet flow rate W2 can be manipulated but its upstream pressure can vary significantly. The exit flow rate w can also be measured. The chief disturbance variable is inlet flow rate wl, which can exhibit very large and frequent changes. Using the instrument provided, you are required to suggest the following control scheme to solve the control problem of the blending system: a) Cascade control only (3 Marks) b) Cascade and Feedforward control (3 Marks) Be sure to clearly identify the MV, CV, and DV for each control strategy. Control valve

Question-AnswerCategory: Chemical EngineeringConsider the liquid blending control system shown in Figure 1 where streaml consists of a mixture of two components and stream 2 has x2= 1. An overflow line maintains a constant holdup in the tank. The control objective is to control the blend composition, x, which can be measured online but there is a significant transport time delay associated with the location of the composition measurement, which is downstream of the blending tank. Inlet flow rate W2 can be manipulated but its upstream pressure can vary significantly. The exit flow rate w can also be measured. The chief disturbance variable is inlet flow rate wl, which can exhibit very large and frequent changes. Using the instrument provided, you are required to suggest the following control scheme to solve the control problem of the blending system: a) Cascade control only (3 Marks) b) Cascade and Feedforward control (3 Marks) Be sure to clearly identify the MV, CV, and DV for each control strategy. Control valve
Hari Krishna asked 1 year ago

Consider the liquid blending control system shown in Figure 1 where streaml consists of a mixture of two components and stream 2 has x2= 1. An overflow line maintains a constant holdup in the tank. The control objective is to control the blend composition, x, which can be measured online but there is a significant transport time delay associated with the location of the composition measurement, which is downstream of the blending tank. Inlet flow rate W2 can be manipulated but its upstream pressure can vary significantly. The exit flow rate w can also be measured. The chief disturbance variable is inlet flow rate wl, which can exhibit very large and frequent changes. Using the instrument provided, you are required to suggest the following control scheme to solve the control problem of the blending system: a) Cascade control only (3 Marks) b) Cascade and Feedforward control (3 Marks) Be sure to clearly identify the MV, CV, and DV for each control strategy. Control valve

Q5. (6 marks) Consider the liquid blending control system shown in Figure 1 where streaml
consists of a mixture of two compon

 
 

1 Answers
MG answered 1 year ago

Subscribe @MazurekGravity on YouTube for free solution video.
 

hak Yesto toho GL Grup Hai →Gp ар Gm Now for Seno (set point Changes) - W= Gelaphu hp Nisp the bu. Go Ephm Kel1+45): (5+2)(W=1 h (3541) lten kell+45) (2373) (3+4) (STS) (sil) W = (2313X3+4) (3+2) (3+1) ง 252385+)8 +9 (35+1)(4:35:43)(5+4)(572)(541)AR VC2w)*+1)(64)*+1)(C4)+1)604? Corner pequenr. . How for Book plots ne finid from open Loop transfer function W con = @ 3, 4Collene for Bo de Stability 11. .WE Cuco AR when = p -2 Wco is frequeny opinet (ã), vozu a most comme), I 2 2- Conil (+4) We

Your Answer